Independent sourcing partner for Fiber Optic Equipment · factory quotations compared on the same rate, wavelength, reach, host, and destination

BUYER CHECKLIST

100g optical transceiver wholesale

Use this 100g optical transceiver wholesale checklist before a brief leaves the buying team. Each row is a field to fill, a field to mark unknown, or a document to request. Nothing on the console is a stock position or a factory approval.

Printed interface checklist on a bench next to LC and MPO reference leads

Ledger of fields and the evidence that should travel with them

Keep the ledger attached to one proposed model. A second model needs a second column. The route notes explain how SR4 and LR4 names diverge. The procurement brief carries the same evidence idea into a longer note.

FieldBuyer entryEvidence to request
InterfaceQSFP28, SFP28, QSFP-DD, or the cage actually installedMechanical drawing or MSA form-factor statement for that model
Data rate100 Gbit/s aggregate, and per-lane rateDatasheet line that says NRZ 4 x 25 Gbit/s or PAM4 single-lambda
Wavelength850 nm, 1310 nm, 1550 nm, or the LAN-WDM setCenter wavelength and tolerance at the stated case temperature
Fiber and connectorOM3, OM4, G.652.D, G.657.A1, LC, or MPO-12Plant record plus the module connector callout
Reach classDesigned meters or kilometers, not a sloganDatasheet reach with the fiber designation it assumes
Optical budgetTx minimum, receiver sensitivity, connector loss, fiber lossThe two optical numbers with units in dBm and the test pattern
DiagnosticsTemperature, voltage, bias, Tx power, Rx power, per lane or notRegister map or digital-diagnostic statement for that firmware
HostPlatform, software release, coded or generic EEPROMHost list the supplier will stand behind, with the release named
Environment0 °C to 70 °C or -40 °C to 85 °C, and the room typeCase-temperature rating on the same datasheet revision
CommercialQuantity, US destination, timing, currency, per-module or order basisQuotation lines that repeat those words rather than a single unit price

Open choices to close before you accept a substitute

Lane plan

A substitute that changes four NRZ lanes into one PAM4 wavelength is not a drop-in because the connector and the FEC moved. Reject the substitute unless the buyer rewrites the fiber and host rows and the supplier answers them again.

Power window

If the substitute datasheet shows a smaller gap between transmit power minimum and receiver sensitivity, recompute the budget with the same connector count. A module with a stronger typical transmit power can still fail when the minimum, which is the number the budget should use, is weaker.

Identity and support

A substitute with a different EEPROM story can pass an optical meter and still be refused by the host. Ask for the behavior on code mismatch before the lot is accepted. Warranty months and return freight have to be restated. They do not carry over from the previous model.

Paper that is not evidence

A family brochure, a photo of a similar bail latch, and a standards title without the model revision are context. They do not prove insertion loss, return loss of the optical port, or compliance. Laser-class and equipment-authorization files, when they apply, must name the model. This checklist does not certify them.

Hand the checklist to the RFQ

There is no file upload on this desk. After the form is submitted, the coordinator can tell you where to send a polarity drawing or a host part number. Write the open rows into the requirement field so the message stands on its own if the drawing arrives later.

Please enter your name.
Please enter a valid work email.
Please enter your company.

Submitting lets the desk review the brief and contact factories. Read the Privacy Policy. Stock, price, compatibility, and compliance stay unconfirmed until a named supplier answers the exact module.